PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing waste and vent piping at the 3rd floor bathrooms Facing North.jpg Continued roof installing at the high roof Facing East 1.jpg Continued roof installing at the high roof Facing South.jpg Installing metal decking at Stair -3 Facing North.jpg Sprinkler branches at the 4th Facing South.jpg
Previous page Sprinkler branches at the 4th Facing South
Sprinkler branches at the 4th Facing South